Contact Us

HBR Head Office
7 Appleton Court, Calder Park,
Wakefield, WF2 7AR

Telephone: 01924 250 132

Fax: 01924 251 394

email: enquiries@hbrlimited.co.uk

Blackwell Southern Regional Office

Coggeshall Road, Earls Colne
Essex, CO6 2JX

Telephone: 01787 222768

Fax: 01787 224391

email: enquiries@hbrlimited.co.uk
Blackwell Midlands and South West Regional Office
4 Bredon Court, Brockeridge Park,
Twyning, Gloucestershire
GL20 6FF

Telephone: 0844 482 9685

email: enquiries@hbrlimited.co.uk
Blackwell Scottish Regional Office
Broken Cross,
Douglas Water,
Lanark
ML11 9PB

Telephone: 01324 483713

email: enquiries@hbrlimited.co.uk
HBR Certificates

Case Studies

  • Sadds Wharf Case Study

    Sadds Wharf

     

     

    Remediation of Former Sawmill and Timber TreatmentWorks that fronted directly onto sensitive estuarine wetland habitat and adjacent to residential properties.

     

    Middlehaven Urban Park 2.bmp

    Middlehaven Urban Park

     

     

    Extensive large scale earth moving and excavation works of former gasworks structures and associated contamination.

     


    Live Pharmaceutical Works

    Live Pharmaceutical Works

     

     

    Extensive in-situ multi-technology “treatment-train” remediation works on a live pharmaceutical production facility in the south-east of England, as part of the Client’s master divestment plan for the site.


    Middlehaven Dock

    Middlehaven Dock

     

     

    The general philosophy of the reclamation scheme was the re-use of all materials available on the site within the construction of the road corridor and development plateaux.  


    soil remediation

    Royal Albert Basin

     

     

    The site comprised of five separate areas totalling circa 100 acres of land contaminated by previous uses as inter alia, a dump for gas works wastes, oil storage and distribution, paint production, coal storage, petroleum wharfage etc.

    contaminated material

    Thames Wharf

     

    The fast track works involved extensive remediation measures to process existing made ground incorporating various contaminated material and fly tipped materials plus the extensive removal of Japanese Knotweed.

    Ammonia Oxidising Bioreactor

    Ammonia Oxidising Bioreactor

     

     

    Following a successful competitive tender process HBR were awarded a design, build and operation contract to treat ammonia impacted groundwater beneath 4 hectares of the Olympic Park of the London 2012 Olympic Games.

    Contaminated Soil Stabilisation

    Stabilisation of Contaminated Soil

     

     

    Ex-situ treatment of soil contaminated with leachable lead, arsenic, cadmium, copper, mercury and selenium, at a prolific site in Stratford for the Olympic Park of the London 2012 Olympic Games.


    Contaminated Soils Washing

    Washing of Contaminated Soils

     

     

    Ex-situ treatment of soil contaminated with leachable lead, arsenic, cadmium, copper, mercury and selenium, at a prolific site in Stratford for the Olympic Park of the London 2012 Olympic Games.


    asbestos contaminated soils

    Woolston Asbestos

     

     

    The Vosper Thornycroft site was used for boat and engine construction throughout the 20th century during which time many processes had contaminated the soil and ground water. 

    Radiological graph

    Radiological

     

    One of the key drivers of the remediation works centred on removing the historical legacy  and “perceived risk” associated with radioactivity from the smelting of naturally occurring radioactive minerals (tin ore) on-site."