Contact Us

HBR Head Office
7 Appleton Court, Calder Park,
Wakefield, WF2 7AR

Telephone: 01924 250 132

Fax: 01924 251 394

email: enquiries@hbrlimited.co.uk

Blackwell Southern Regional Office

Coggeshall Road, Earls Colne
Essex, CO6 2JX

Telephone: 01787 222768

Fax: 01787 224391

email: enquiries@hbrlimited.co.uk
Blackwell Midlands and South West Regional Office
4 Bredon Court, Brockeridge Park,
Twyning, Gloucestershire
GL20 6FF

Telephone: 0844 482 9685

email: enquiries@hbrlimited.co.uk
Blackwell Scottish Regional Office
Broken Cross,
Douglas Water,
Lanark
ML11 9PB

Telephone: 01324 483713

email: enquiries@hbrlimited.co.uk
HBR Certificates

Soils Stabilisation

Case Study - Soils Stabilisation Olympic Park  - London 2012 Games

Contract In Brief:  
Location: Contract: Client:
London 2012 Games - Olympic Park

Ex-situ Contaminated Soils Treatment

Olympic Delivery Authority
HBR Role: Managing Consultant: Contract Period:
Main Contractor using
CampbellReith as design team

Tier II Specialist Remediation Contractor

CLM 25 weeks
Contract Value: Contract Start:
£0.4M April 2008
HBR Site Management    
Contracts Manager: Project Manager: Site Manager:


 

Project Background:

Following commencement of treatment operations using 2 HBR washing plants, HBR were instructed to mobilise and erect one of our automated batch mixing plants, for use in the chemical stabilisation of a problematic hotspot of contamination unsuitable to other treatment techniques.

The period of plant installation and commissioning was used to perform and validate the optimisation of the stabilisation recipe design for the materials in question. This was carried out on-site by HBR remediation engineers within our mobile laboratory. The chief contaminants of concern were leachable concentrations of Arsenic, Mercury, Selenium, Cadmium and Lead.

An additional focus of the design centred on the simultaneous improvement of the material’s geotechnical properties. Independent review and analysis of the treatability study work showed minimum reductions in leachate concentrations for all contaminants of over 80%, well above those needed to reach the chemical re-use acceptance criteria. This allowed design acceptance by the managing consultant and Regulator.

The finalised treatment design consisted of a single powder reagent in combination with two liquid additives. Feedstock materials were thus brought to the treatment centre, quarantined and tracked using the site-wide materials management system.

Operation Phase:

The on-board Programmable Logic Controller (PLC) of the batch mixer was uploaded with the designed recipe and set to work, initiating an automated batch processing sequence with an averaged production of 500 tonnes/day. Records were logged by the PLC for each batch (approx 3mof soil), showing percentage of each additive and mix time. All such QA/QC procedures were monitored by the single process operator, with treated materials stockpiled for independent validation.

All processed volumes achieved compliance against chemical leachate and geotechnical criteria allowing re-use on-site. In total some 30,000 tonnes of material was processed and incorporated back into the earthworks design.